The National Grid Corporation of the Philippines (NGCP) aims to restore power transmission lines in Bohol by December 31, despite extensive damage from Typhoon Odette.
NGCP is prioritizing the repair of damaged transmission systems between Tagbilaran and Ubay, specifically the Tagbilaran-President Carlos P. Garcia, Alicia to Ubay line, and the Tagbilaran-Polilya-Carmen-Ubay line, both with 69-kilovolt capacity.
Challenges in restoration efforts include blocked roads, fuel shortages, and the complexity of repairing high transmission towers connecting Bohol to the main grid via Leyte.
Bohol II Electric Cooperative, Inc. (BOHECO II) confirmed that the backbone of the Valencia to Alicia line in the 3rd district is ready to receive power from NGCP.
A task force is currently working on the transmission line from Alicia to Ubay, Talibon, Trinidad, and other interior areas.
Topics in this story
Explore more stories about these topics.
🤖
This story was generated by AI to help you understand the key points. For more detailed coverage, please see the news articles from trusted media outlets below.
News Sources
See how different news organizations are covering this story. Below are the original articles from various Philippine news sources that contributed to this summary.




